Bowdoin, ME 04287
· Developed DDG 1000 and FFG(X) system diagrams, descriptions, and calculations for the following systems:
o Firemain/Magazine Sprinkling/Compartment Sprinkling/Aqueous Film Forming Foam
o Ship’s Fuel System
o Ballast/Deballast, Dewatering and Main Drainage System
o Primary Damage Area Cooling System
o Miscellaneous Piping System
· Reviewed, interpreted, and incorporated Military Specifications, Naval Vessel Rules, Commercial Specifications, and Design, Build and Procurement Specifications into the design of systems
· Provided construction support for DDG 1000 and DDG 51 class ships
· Developed C++ console applications and Excel VBA code to increase efficiency
· Performed system reviews to validate and optimize Reliability Centered Maintenance (RCM)
· Moved maintenance tasks to a Condition Based Maintenance (CBM) philosophy
· Supervised subcontractors performing ship maintenance
Clearance: Department of Defense Secret Security Clearance – Current
· Reviewed and generated changes to piping diagrams
· Performed and reviewed piping system calculations
· Updated Submarine Safety (SUBSAFE) Design Review Reports
· Provided construction engineering support at the Norfolk Naval Shipyard for the SSGN project
· Worked with trades to resolve construction issues
· Reviewed and generated drawing changes to facilitate construction
· Supported work on electrical and structural systems
· Provided construction engineering support for the Virginia class submarine at the Norfolk Naval Shipyard and the New London Submarine Base
Cumulative GPA: 3.820/4.000
Cumulative GPA: 3.810/4.000
Cumulative GPA: 3.210/4.000
Cumulative GPA: 3.380/4.000